60-Ton Chiller and 1 Million BTU Boiler Replacement
Casa Del Pueblo
Completion Date: June 2026
Our Approach & Scope of Work
Bay Area Mechanical replaced an aging chiller and Boiler #2 with new, energy-efficient equipment to improve the facility’s heating and cooling performance. The project included the safe removal of the existing equipment, a coordinated crane lift, installation of new hydronic piping, gas piping, venting, controls, and equipment supports, and reconnection of all mechanical and electrical systems.
Following installation, our team completed pressure testing, system startup, commissioning, and operational verification in coordination with the manufacturer. The project concluded with warranty documentation and on-site staff training, delivering a reliable, modern central plant designed for long-term performance and efficiency.