Lockout/tagout procedures were performed on the electrical, gas, and water systems as required before draining, disconnecting, and removing the existing boiler. A new boiler was then set in the same location, securely anchored to the pad, and reconnected to all electrical, communication, gas, and plumbing services. The system was started up and verified to be operating properly.