Our team kicked off this project by installing vapor barrier insulation into a 6” pit that was 40ft x 45ft followed by installing a boiler and all the boiler components. We then proceeded to assemble the 40x45x20 cooler which required a 40 ft steel support beam and over 30 individual panels. Our project managers coordinated all inspections with the city of San Francisco and performed start up for both the cooler and boiler.