Replacement of 9 Reznor Duct Furnaces in Emeryville
Watergate Community Association
Completion Date: July 2026
Our Approach & Scope of Work
Bay Area Mechanical completed a large-scale HVAC replacement project involving the removal and installation of nine Reznor duct furnaces across four buildings at the Watergate Luxury Residential Complex. The project required extensive coordination across four mobilizations, including a large crane lift, coordination with the roofing contractor, gas piping modifications, electrical extensions, ductwork fabrication, roof penetration work, startup, and final system testing. Our team worked closely with other trades throughout the project to ensure each unit was safely installed, properly connected, and returned to reliable operation.
Project Highlights:
Removed and replaced 9 Reznor duct furnaces
Completed work across 4 commercial buildings
Coordinated a large crane lift for equipment removal and installation
Required 4 mobilizations to complete the project
Utilized a full Bay Area Mechanical crew throughout the installation
Modified gas piping, electrical, and low-voltage connections
Fabricated and sealed new ductwork and roof penetrations
Coordinated closely with roofing contractors
Performed equipment startup, testing, and final commissioning